The engine and gearbox has now been removed. We had multiple staff members working together to guide the engine and gearbox assembly out. We have then sat the engine onto a tyres and then on a pallet for transport. We also removed the gearbox from the engine and put that on a separate pallet.
The parts have been wrapped up and placed kn a pallet and all three pallets will be wrapped up and strapped down for transport.